ET9220G
Availability: | |
---|---|
Quantity: | |
Product Advantage
ET9220G second-generation co-extruded wall panel features a 3mm wear-resistant overlay molecularly bonded to a reinforced composite substrate, creating a seamless moisture barrier. Its quad-channel airflow system achieves 28% weight reduction (density 1.25g/cm³) while maintaining 380kg/m² load capacity. Offers 12 standard hues and full-spectrum customization using nano-pigment infusion technology, guaranteeing color stability for a decade.
The core material combines 92% recycled HDPE/wood fiber composite with:
5,000-hour QUV accelerated weathering (ASTM G154)
500N surface impact resistance (EN 12664)
0.15% linear thermal expansion rate
10,000-cycle freeze-thaw endurance
Incorporates concealed snap-lock joints (<0.5mm seam tolerance) and integrated drainage channels handling 300mm/hr rainfall. Complies with EN13501-1 B-s1,d0 fire safety standards, delivering 28MPa flexural strength (ISO 178). Ideal for curtain walls, interior feature surfaces, and architectural landscapes, backed by 20-year structural warranty.
Technical Parameters
Model NO. | ET9220G | Specification | 218.5*25mm |
Color | Customized | Environmental Standard | E0 |
Usage | Household, Outdoor, Commercial | Pattern | Wood Grain |
Material | 60% Wood+ 30% HDPE+ 10% Additives | Certification | CE. ISO. SGS,FSC,Intertek |
Length | 2.2m/ 2.9m/ 3.6m or Customized | Working Environment | -40~70 Degrees Celsius |
Product Uses
1. For home decoration: as wall cladding for outdoor wall, fence, ceilings |
Installation Guide
1. Main products
ET9004 Joist
ET9220G Cladding
ET9216G Starter
ETS4*35 Screw
ET9333G Cover
(Recommend to use Aluminium or Steel joist if the height more than 5m)
Please note: before fix the screws into the joist or cladding, you must pre-drill holes on the joist and cladding.
2. Fix the joist to the wall
(1) Use expansion screws to fix the ET9004 joist (or aluminum joist) to the wall, the distance between the expansion screws is 400-500mm, the distance between the joists is 450-500mm as below:
3. Install the ET9220G cladding
(1) The screws must be fixed in the middle of the screw position line, and make sure the screws are fixed into the joist.
(2) Pay attention to the flat installation and follow the principle of horizontal and vertical.
4. Install the cladding boards one by one
(1) After fixing the Starter board, then fix the cladding boards one by one. Pay attention to if the boards are put into the previous boards correctly by watching the connection gap, otherwise, use rubber hammer to knock slightly.
5. Use ET9333G cover profile to cover the edge
(1) After fixing all cladding boards, use ET9333G cover profile to cover the edge/end, so that it looks good.
6. Installation finish
(1) After fixing the corner profiles, check if the screws fixed well.
FAQ